*An Easy Permit is filled out for ownership and the following contractor changes:
A letter (only original letters will be accepted-no faxes and no copies) is required from the new tradesman on their letterhead. For a GC, the letter must be notarized and accompanied by a notarized letter from the owner. It is $50 per contractor change.
For an Electrician, they go on line and pull a permit for maintenance with the number of services as “1” or pull a permit for one receptical. The description of work is “change of electrical contractor for original permit #________”.
For Ownership changes we require a copy of the deed as well as a notarized letter from the new owner.