Current Contracts and RFPs


2014 Public Way Construction Regulations

What We Do

Construction, Permits, Utilities and Contracts

A key part of Mayor Emanuel's Building a New Chicago infrastructure investment program, CDOT manages nearly 100 construction projects each year, generally totaling more than $500 million, which are performed by both in-house construction crews and private contractors.  

These projects cover a wide array of capital improvements, from the complete reconstruction of  Wacker Drive to the replacement of a square of sidewalk in front of a residence.   Engineers, architects and other technical professionals on each job ensure that the project is built in accordance with the contract plans and specifications.  They are also responsible for properly documenting all work and materials to the satisfaction and requirements of all federal, state and local funding agencies. 

CDOT’s Public Right of Way Permit Office is responsible for issuing permits for the use or work in the public way.  Some of the applications and permits that are attainable through the office are: Athletic Events Applications; Parade Applications; Public Assembly Notifications; Commercial Refuse Containers Permits; Deep Foundation Permits; Driveway Permits; Public Way Opening Permits; and Public Right of Way Use Permits.

The CDOT Office of Underground Coordination (OUC) is responsible for all requests regarding existing utility information and the review/approval of construction work in or adjacent to the Public Way.  This also includes large projects with deep excavations and penetrations, such as foundations (piles, caisson, etc.), earth retention systems or major piping installations.  The OUC also works with the permit office to monitor and coordinate construction projects by public utilities in order to minimize the disruption and maximize the infrastructure benefits for Chicago taxpayers. 

Most Recent News (Construction, Permits, Utilities and Contracts)

Dec 7, 2015 CDOT Online Permit Portal Opens Today
Oct 16, 2015 CDOT Announces North Lake Shore Drive Resurfacing Project Will Close Two Lanes Overnight Between Grand And North Avenue
Jun 1, 2015 CDOT is Soliciting Comments on the Rules and Regulations for Construction in the Public Way June 1st - 30th
Apr 8, 2015 Clark Street Bridge Painting Project
Apr 8, 2015 Full Stops Planned Overnight Friday Into Saturday On South Lake Shore Drive

View all News Releases (Construction, Permits, Utilities and Contracts )